I haven't done a bathroom update in a while, and I'm happy to report things are moving along quite nicely.  As of yesterday, all the tile was laid.  The shower is finished, and the floor tile as well as the baseboard tile is down!




 Shower tile complete 

Floor tile with tile baseboard.  We opted to do tile for the baseboard rather 
than quarter round or wood baseboard.

Before the tile project is complete, we have to put down grout in the shower and the floor as well as caulk.  We also have to clean and seal the marble time.  After that, we need to install the shower door as well as the glass shelf in the shower.  Once the shower door is in, we can put in the new light, toilet, vanity, and over the toilet cabinet.  We also need to get the fixtures put up in the shower.  We are getting close, and hope to be done in about a week.  Soon, we will be back to two and a half bathrooms!
 